• image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image
  • image

PROJECT DESCRIPTION

This project is a 45 acre site where we moved over 200,000 cy of dirt.  There are three industrial buildings with a total of over 562,000 SF of new floor space to be built on this site, which included over 6,000 lineal feet of footings to excavate and backfill.  Also there are around 750,000 SF of concrete and bituminous pavements on this project of which we hauled in over 25,000 tons of class 5 under the concrete pavements.  We built 5 wet ponds and 3 infiltration ponds as part of this project.
  • Location: Brooklyn Park, MN
TOP