• image
  • image
  • image
  • image
  • image

PROJECT DESCRIPTION

The 6,300 LF of Highland Road reconstruction included importing 22,000 tons of sand to improve the road bed subgrade.  The highlight of this project was when Fehn Companies utilized over 5,000 CY of wood chips per the civil engineers direction.  This lightweight fill option aided in bridging the subgrade across the typical wetland soft peat below grade soils as shown in the job site pictures.
  • Location: Minnetriska, MN
TOP